CONSTRUCTION / REPAIR AND INDUSTRIAL MAINTENANCE
ASSEMBLY OF METALLIC STRUCTURES
(Customer: BYSTEEL S.A. | Project: Maat Museu EDP, Lisboa - Portugal)
In this project, RCC was one of the subcontracted for the assembly of the metal structure of the Maat Museum in Lisbon, which lasted 6 months
INDUSTRIAL ASSEMBLY
(Customer: CTE - Compagnie Thermique Européenne | Project: Flat Glass Oven (Fiberglass), Chambery - France)
RCC, in this project, was one of the subcontracted for the assembly of a fiberglass furnace and all its components, a 770-ton project with a duration of 4 months.
PREFABRICATION AND ASSEMBLY OF METALLIC STRUCTURE
(Customer: Horta Coslada Madrid | Project: Stadium Wanda Metropolitan, Madrid - Spain)
It was also subcontracted that RCC was part of this project for the pre-fabrication and assembly of the entire metallic structure of the Wanda Metropolitan in Madrid, a project that lasted approximately 1.5 years.
INDUSTRIAL ASSEMBLY AND PIPING
(Customer: TCC Europe | Project: Cement Factory of Liège - Belgium)
RCC was one of the subcontracted for the assembly of cooling and assembly of the furnace ferrule 2, from the Liege Cement plant, 2 months’ work.
PREFABRICATION OF METALLIC STRUCTURES
(Customer: Swartzh Puerto Tarragona | Project: Manufacture of Metal Structures, Tarragona - Spain)
Pre-manufacturing of metal structures and all types of welding and assembly of metal structures and piping, we have been working on this client since 2013 till this date.
INDUSTRIAL ASSEMBLY
(Customer: LizMontagens | Project: Verallia Azuqueca, Madrid - Spain)
Assembly works of glass-bottle furnaces. Duration of 3 months, and 420 tons
INDUSTRIAL ASSEMBLY
(Customer: LizMontagens | Project: Guardian Flachglass GmbH, Thalheim - Germany)
Assembly works of flat glass furnace. Duration of 3 months, and 422 tons.
INDUSTRIAL ASSEMBLY
(Customer: LizMontagens | Project: Ardahg Glass, Portland - U.K)
Assembly works of flat glass furnace. Duration of 3 months, and 422 tons.